INSTALLATION INSTRUCTIONS:
*Turn off electricity at the main switch on the distribution board
*Ensure that there is no electricity supply at the point of installation before commencing
* Remove switch cover plate/cover strips – terminate live incoming conductor to the center terminal on switch module
*Terminate return conductor ( wire going to the light fitting) to remaining terminal on switch module
* Terminate earth conductor to the earth terminal on switch cradle ( if provided on a steel switch & cradle )
*Fix switch cradle to the wall box
*Refit cover plate / cover strips to the switch
*Turn on electricity on main switch or the distribution board
*Test for power to the light fitting by switching the light on/off (Ensure the light fitting/lamp is in working order before hand)
INSTALLATION INSTRUCTIONS DO NOT APPLY TO ISOLATORS.

3W LED C35 E14
12W Emergency Light Bulb
DST64 3w LED Bulb E27
Yamato 2.5M Insulated Cable
Babil (Grey, White)120x180
C35 WW FILIMENT E14 3W
18W Office Light
7W Led Strip ceiling Light
White CN-K006 




Reviews
There are no reviews yet.